Grants6 min read5 January 2025

Commercial EV Charging Grants UK: What's Still Available in 2025

EVCG, WCS, ORCS and Plug-in Van Grant — the grants UK businesses, landlords and fleets can still claim for EV charging infrastructure in 2025.

Several UK grants for commercial EV charging infrastructure are still open in 2025. The four that matter for most businesses, landlords and fleets are WCS, the EV Infrastructure Grant for Staff and Fleets, ORCS and the EV Chargepoint Grant for Landlords. Here's what each covers — and how to combine them.

1. Workplace Charging Scheme (WCS)

Full walkthrough in our WCS guide.

2. EV Infrastructure Grant for Staff and Fleets

3. EV Chargepoint Grant for Landlords

4. ORCS (On-Street Residential Chargepoint Scheme)

What's closed (don't rely on these)

Stacking strategy

The two big stacks for 2025 are:

How to claim cleanly

  1. Confirm eligibility before ordering hardware.
  2. Use an OZEV-authorised installer — non-authorised work doesn't qualify.
  3. Pick hardware from the OZEV-approved list for each scheme.
  4. Keep DNO and grant timelines aligned — many grants expire 6 months after issue.

For an independent view on which grants apply to your specific site — and a costed comparison of stacked vs unstacked options — run the numbers in our free feasibility calculator or read the commercial install cost guide.


← All insights

Planning EV charging for your site?

Run a free feasibility check in minutes, or speak directly with an independent EV infrastructure consultant.